This is a full technical and cost overview of a 100KW solar system in Pakistan. It covers all parts, wiring details, distribution boxes, estimated prices, and information about the solar panels.
100KW Solar System – Complete Package Details (Pakistan)
Ideal For:
-
Large factories
-
Shopping malls
-
Housing societies
-
Universities/hospitals
-
Agricultural farms
1. Core Components
A. Solar Panels (Tier-1)
-
Model: JA Solar/Jinko/Longi (540W-600W)
-
Quantity: 185-200 panels (100KW)
-
Type: Monocrystalline, 21-23% efficiency
-
Mounting: Industrial-grade aluminum structure
-
Daily Output: 400-500 units (summer)
B. Hybrid Inverter
-
Model: Auxsol/Growatt/Solis 100KW 3-phase
-
Type: On-grid/Hybrid (grid-tie with battery backup option)
-
MPPT Channels: 4-6 for string optimization
-
Efficiency: 98%+
C. Lithium Batteries (Optional Backup)
-
Model: Dyness/Pylontech 51.2V 100Ah
-
Capacity: 50-100kWh (modular)
-
Backup: 8-12 hours for critical loads
2. Electrical Components
A. Wiring & Cabling
-
DC Cables: 6mm² to 10mm² PV1-F (UV-resistant)
-
AC Cables: 35mm² to 50mm² THHN (copper)
-
String Combiner Box: 6-8 inputs with surge protection
-
Conduits: PVC/EMT for protection
B. Distribution Board (DB Box)
-
Main DB: 250A 3-phase with surge protection
-
AC/DC Isolators: 4-pole 63A/100A
-
Protections:
-
MCCB (250A)
-
SPD (Lightning arrestor)
-
Earth leakage relays
-
C. Earthing & Safety
-
Earthing Kit: Copper rod + strip (GI)
-
Lightning Protection: Class II SPD
3. 100kw solar system Price in Pakistan Estimate
Component | Price (PKR) | Notes |
---|---|---|
Solar Panels (100KW) | 3000,000 – 4500,000 | Tier-1 brands (540W+) |
On-Grid Inverter | 800,000 – 1200,000 | 100KW 3-phase |
netmetering | 1000,000-1500,000 | |
Mounting Structure L2 | 350,000 – 600,000 | Galvanized steel |
Cabling & DB | 400,000 – 800,000 | Copper wiring |
Installation | 300,000 – 500,000 | Labor & commissioning |
Total | 5850,000 – 9200,000 | Without batteries: ~5.8M PKR |
4. 100kw solar system Technical Specifications
-
System Voltage: 1000V DC / 380V AC 3-phase
-
Net Metering: Compatible (apply via DISCO)
-
ROI Period: 3-4 years (with net metering)
-
Warranty:
-
Panels: 30 years
-
Inverter: 5-10 years
-
Batteries: 5-7 years
-
5. Installation Requirements
-
Roof/Ground Space: 600-800 sq. meters
-
Grid Approval: NEPRA net metering license
-
Maintenance: Quarterly cleaning + annual inspection
6. FAQs
Q: How much electricity will it generate?
A: 1,200-1,500 units/day (summer), 800-1,000 units/day (winter).
Q: Can it run heavy machinery?
A: Yes, but requires proper load balancing (consult an engineer).
Q: Govt. subsidies?
A: Limited initiatives; check with AEDB.
“Get a customized 100KW solar design! Contact us for a free site survey and bank financing options.”
This breakdown covers technical, commercial, and regulatory aspects for industrial/commercial buyers in Pakistan.