1 Mega Watt Solar plant

1 Mega Watt Solar plant

1 MW Solar Plant – Complete Technical & Commercial Breakdown

🔋 System Specifications:

  • Total Capacity: 1,000 kW DC (1 MW)

  • Panels Required: 1,800-2,200 x 450W-550W panels

  • Space Requirement: 4-5 acres (or 20,000-25,000 sq. ft. rooftop)

  • Daily Generation: 4,000-5,500 kWh (annual ~1.5-2 million units)

  • Grid Connection: 11kV or 33kV (requires NEPRA license)

💡 Key Components:

  1. Solar Modules:

    • Recommended: LONGi 585W bifacial or Jinko Tiger Neo 610W

    • String Configuration: 28-32 panels per string

  2. Central Inverters:

    • Options: Huawei SUN2000-100KTL / Sungrow SG250HX

    • Quantity: 10-12 units (100kW each)

  3. Mounting Structure:

    • Galvanized steel (ground mount) or aluminum (rooftop)

    • Tracking systems available (+15-25% output)

  4. Balance of System:

    • DC combiner boxes

    • 11kV/33kV transformer

    • SCADA monitoring system

💰 Financials (2024 Estimates):

Item Cost (USD) Cost (PKR)
Equipment $550,000-$700,000 154-196 million
Civil Works $100,000-$150,000 28-42 million
Grid Connection $50,000-$80,000 14-22 million
Total CAPEX $700,000-$930,000 196-260 million

📈 ROI Analysis:

  • Annual Savings: 18-24 million PKR (at PKR 12-15/unit)

  • Payback Period: 5-7 years

  • Project Life: 25+ years

⚡ Energy Output:

Month Daily Avg (kWh) Monthly (kWh)
Summer 5,000-5,500 150,000-165,000
Winter 3,500-4,000 105,000-120,000

🏗️ Implementation Timeline:

  1. Feasibility Study: 2-4 weeks

  2. NEPRA Approval: 3-6 months

  3. Installation: 4-6 months

  4. Commissioning: 2-4 weeks

✅ Top EPC Contractors in Pakistan:

  1. Hisel Power

  2. Pakistan Solar Traders

  3. Hadi Electric

  4. SkyElectric (Zong Project Specialists)

⚠️ Key Considerations:

  • Must obtain Generation License from NEPRA

  • Requires environmental impact assessment

  • 17% sales tax applies on equipment

  • Land lease costs if not owned

🌱 Green Benefits:

  • Annual CO₂ reduction: ~1,200 tons

  • Equivalent to planting 30,000 trees

📜 Regulatory Requirements:

  1. NEPRA Generation License

  2. EPA Approval

  3. Grid Code Compliance (NTDC/DISCO)

  4. PPA if selling to grid

🔍 Suitable For:

  • Textile mills

  • Universities

  • Industrial zones

  • Shopping malls

  • Housing societies

💡 Emerging Trends:

  • Hybrid systems with battery storage (10-20% capacity)

  • Floating solar options for water bodies

  • Solar+wind hybrid configurations

For a customized 1MW project proposal including:

  • Detailed technical drawings

  • Financial modeling

  • EPC contractor comparisons

  • Regulatory compliance roadmap

Please provide:

  1. Site location

  2. Land/rooftop details

  3. Current electricity consumption

  4. Preferred financing model (CAPEX/OPEX/Lease)

 

or Call Now for meeting 03041111988

Related Post

Leave a Reply

Your email address will not be published. Required fields are marked *